• B18/33 second industrial zone new Borg alarab city Alexandria

المشاريع

National Electricity Technology

The company carried out a range of metal works, including metal tanks and supports, a truss and a metal mesh fence.

Read More

KAHARABA NATIONAL ELECTRICITY TECHNOLOGY CO

The company carried out fire-rated doors in the unit.

Read More

Wet Ever Cosmetics Company

The company carried out sanitary doors in the cream and liquid floors at the factory on the 10th of October.

Read More

Professional Care

The company carried out sanitary doors for production in the factory.

Read More

PURE

The company carried out the work of galvanized and aluminum sanitary doors in the production stages of the factory in Quesna.

Read More

Actimid

The company carried out the doors for the Clean Room in the factory.

Read More

Parkville Pharmaceuticals

The company carried out a set of sanitary doors at the ICI factory in Burj Al Arab.

Read More

Lisan Gleim Project

The company made a metal structure

Read More

Alex west

The company made a group of pergolas and metal fences in the compound.

Read More

Jamalon

Factory upper truss work.

Read More

Dabaa lift station

The company carried out a set of metal works at the station, including a metal canopy with a capacity of 7,750 tons, metal barriers with a capacity of 7,350 tons, marine stairs, and a group of fire-resistant doors and metal …

Read More

Downtown Worlds

Making a metal base for the generator, the roof handle, and the chassis for the pump room, and two metal portholes and cafeterias with a capacity of 22 tons.

Read More

PURE

The company carried out the clean room work for the factory, including sandwich panels, epoxy floors and walls, and sanitary doors.

Read More

Professional Care

The company carried out the clean room work for the factory, including sandwich panels, epoxy flooring, and sanitary doors, for a total area of ​​(360) square meters.

Read More

Actimid

The company made a clean room for the weight and laundry room, and supplied and installed its sanitary doors and manufacturing floors.

Read More

leven

The company carried out clean room works as an expansion of the factory, including sandwich panel works, hygienic water trap works, and production theaters for preparation tanks.

Read More

Amar group

The company made a clean room for assembling the devices.

Read More

El-Nile Co. for Pharmaceutical and chemical Industries

The company made a clean room for the factory’s packaging line.

Read More

Central kitchen in Dabaa

The company carried out concealed air conditioning and ventilation work in the kitchen on an area.

Read More

Actmed Cosmetics Factory

The company carried out the HVAC air conditioning system in the factory.

Read More

Parkville Pharmaceuticals

   تركيب نظام تكييف الهواء الصناعي تفخر شركة التقنية للخدمات الهندسية بتقديم هذا المشروع لتركيب نظام تكييف الهواء، والذي يعكس خبرتنا في الحلول الكهروميكانيكية والصناعية. تم تصميم هذا النظام لمرفق تصنيع عالي الأداء، وهو مثال على التزامنا بتوفير أنظمة متطورة …

Read More

WET EVER Wet Ever Cosmetics Company

The company carried out fire fighting, air conditioning, electrical, plumbing, and network works for the factory on an area of 750 square meters in 10th of Ramadan City.

Read More

PURE MISR Pure Misr Cosmetics Company

The company was assigned the work of the air-conditioning system, ventilation works, plumbing works, production networks and its thermal insulation works for 6 floors in the factory with a total area of (2350) square meters in Quesna – Menoufia Governorate.

Read More

Levine Cosmetics Company Levine Cosmetics

The company carried out the work of the air conditioning system for the expansion floor of the factory on an area of 830 square meters in order to achieve the required pressures in the rooms, as well as the work …

Read More
DOWNLOAD A COMPLETE CATALOG OF OUR SERVICES AND PROJECTS SPECIFICATIONS
Download